For low slope drip edge details install a six-inch strip of base layer between the deck and the edge material. We recommend that the edge metal does not come into direct contact with the deck or substrate begin by installing the base layer placing it on the deck and allowing enough extra material to where you can turn it down the face of the deck but not longer than the face of the metal edge. once the base layer is set in place remove the release film and install the product. remember to use a hand roller to ensure full adhesion to the surface. next install metal edge on top of the base layer and nail it at four inches on center in a staggered pattern, before installing the field sheet it is recommended that all metals should be primed with an ASTM D 41 asphalt primer such as PG 100. allow the primer to dry and install the field sheet to complete this detail. remember to use a roller to ensure full adhesion to the surface. for more information contact your Polyglass technical services representative.