27th December 2020, 17:25hrs Makalidurga viaduct, around a KM from the station. 02139 Yeshwanthpur Jabalpur weekly special, led by Guntakal (GTL) ALCo twins, WDM3A #16752 and WDM3D #11448 crosses the Makalidurga viaduct at MPS of around 75 Km/h and slows down to switch tracks and enter the double line section, just before the station. The train was delayed by around 45 minutes as it was held up near/at Yelahanka. The second line, seen on the right, is now operational and the trains coming from Yelahanka use that line. Thanks for watching!!