Since the last video update, we have planed and leveled all joists, taped the joists with trex butyl tape, installed the wiring for the trex lighting system on all of the rail posts and stairs, installed trex deck material on a couple of stairs, the picture frame of two boards around the deck, and are halfway done with the infill of decking. Filmed on a GoPro Hero 8 Black Song Credit - Locally Sourced by Jason Farnham